Today.....the 5th day ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....
The OKUBI HOTEL was asking pp about to automate the Hotel-Watersystem, what will be done by Emmanuel
Work for the high level tanks(4 polytanks) ,that is the automatic switch control was done successfully left with low level(2 polytanks)...
Today .....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
Work to be continued on 161004......