Okubi Hotel management requested for pool pump to be checked ...the workbwas checked and estimate was prepared in due time to fix the pool pump and the pool filtering system.
https://drive.google.com/open?id=0BwUPsWGsMLpBa1JmOEo1NlJsU2c
The OKUBI HOTEL was asking pp about to automate the Hotel-Watersystem, what will be done by Emmanuel
Montag, 26. Dezember 2016
Freitag, 7. Oktober 2016
161006
Today.....the 5th day ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....
Mittwoch, 5. Oktober 2016
161005
Today fountain work was critically diagnosed and improvised a way to solve for all to work....
* The frog design of the fountain was chiseled out and found that the pumps were broken...
* All cables feeding the fountain were broken and couldn't work...
* A new piping system is now being designed to make found operate again...
* The frog design of the fountain was chiseled out and found that the pumps were broken...
* All cables feeding the fountain were broken and couldn't work...
* A new piping system is now being designed to make found operate again...
161004
Work for the high level tanks(4 polytanks) ,that is the automatic switch control was done successfully left with low level(2 polytanks)...
Montag, 3. Oktober 2016
161003
Today .....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....
Work to be continued on 161004......
Sonntag, 2. Oktober 2016
Samstag, 1. Oktober 2016
Sa 1.Okct.2016 We get the project OK
Hotel OKUBI Dir. Rita send me a Whatsapp for the OK
Pls Mr Pierre, go ahead wt the pump work of d water well and the fountain, I agree wt d payment with initial pay of 1000cedis
So pp informed Emmanuel to start... he will start at monday
Pls Mr Pierre, go ahead wt the pump work of d water well and the fountain, I agree wt d payment with initial pay of 1000cedis
So pp informed Emmanuel to start... he will start at monday
Mittwoch, 28. September 2016
28.Sept.2016 pp gave Estimate an OKUBI hotel Mr Emmanuel
At Brakefast gave pp the estimate GHS 2442
Montag, 26. September 2016
25.09.16 drawing update
I updated the drawing for Okubi hotel water automation system .........
i added a legend to the drawing to make it more understanding to read ........
i added a legend to the drawing to make it more understanding to read ........
Drawing for okubi water automation system
1/ today we went to okubi to do actual measurement of length and height to fit in the estimate ....
2. the drawing for the automation system is also prepared.....
location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.
2. the drawing for the automation system is also prepared.....
location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.
estimate update
I updated the estimate done for okubi hotel
https://drive.google.com/open?id=0BwUPsWGsMLpBc1lMcF9jVHdRWkE
https://drive.google.com/open?id=0BwUPsWGsMLpBc1lMcF9jVHdRWkE
Dienstag, 20. September 2016
Estimate for the water automation system
1/ estimate for the water automation system at okubi hotel done .......
yet to be given to the management for acceptance.\\\\\
https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0
yet to be given to the management for acceptance.\\\\\
https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0
Estimate for the water automation system
1/ estimate for the water automation system at okubi hotel done .......
yet to be given to the management for acceptance.\\\\\
https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0
yet to be given to the management for acceptance.\\\\\
https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0
Freitag, 16. September 2016
160916 - Okubi hotel