Montag, 26. Dezember 2016

161225. okubi_ estimate for pump and pool filtering

Okubi Hotel management requested for pool pump to be checked ...the workbwas checked and estimate was prepared in due time to fix the pool pump and the pool filtering system.

https://drive.google.com/open?id=0BwUPsWGsMLpBa1JmOEo1NlJsU2c

Freitag, 7. Oktober 2016

161006

Today.....the 5th day ....
16th of Oct. 2016
Work after all is done and completed....
The automation and fountain work ....

Mittwoch, 5. Oktober 2016

161005

Today fountain work was critically diagnosed and improvised a way to solve for all to work....
* The frog design of the fountain was chiseled out and found that the pumps were broken...
* All cables feeding the fountain were broken and couldn't work...
* A new piping system is now being designed to make found operate again...

161004

Work for the high level tanks(4 polytanks) ,that is the automatic switch control was done successfully left with low level(2 polytanks)...

Montag, 3. Oktober 2016

161003

Today .....
I went to purchase materials for Okubi water automation system.....
Sulley and David started with the fountain works ...
The old pump system was troubleshooted and was bent ....so a new pump was fixed and tested running....
And also the cable for the automation water system was drawn....

Work to be continued on 161004......

Sonntag, 2. Oktober 2016

161002

The drawing for the Okubi hotel water automation system is updated with few changes....

Samstag, 1. Oktober 2016

Sa 1.Okct.2016 We get the project OK

Hotel OKUBI Dir. Rita send me a Whatsapp for the OK

Pls Mr Pierre, go ahead wt  the pump work of d water well and the fountain, I agree wt d payment with initial pay of 1000cedis

So pp informed Emmanuel to start... he will start at monday

Montag, 26. September 2016

25.09.16 drawing update

I updated the drawing for Okubi hotel water automation system .........
i added a legend to the drawing to make it more understanding to read ........



Drawing for okubi water automation system

1/ today we went to okubi to do actual measurement of length and height to fit in the estimate ....
2. the drawing for the automation system is also prepared.....

location surveying and fountain diagnosis was done by I- Emmanuel. Sulley and David.






estimate update

I updated the estimate done for okubi hotel

https://drive.google.com/open?id=0BwUPsWGsMLpBc1lMcF9jVHdRWkE

Dienstag, 20. September 2016

Estimate for the water automation system

1/ estimate for the water automation system at okubi hotel done .......
yet to be given to the management for acceptance.\\\\\



https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0

Estimate for the water automation system

1/ estimate for the water automation system at okubi hotel done .......
yet to be given to the management for acceptance.\\\\\



https://drive.google.com/open?id=0BwUPsWGsMLpBUEphTllPTlB4cU0

Freitag, 16. September 2016

160916 - Okubi hotel

the preposition of the construction of water automation system and fountain repair for okubi hotel
4 polytsnk on rooftop
location- Abrepo Ashanti
fountain
polytank
first look of the system///,,,,,