Donnerstag, 24. Mai 2018

22.Mai 2018 Pumpsystem fixing for avers did cose the problem

[22:00, 23.5.2018] GH GSE-p1a Aidoo Stephen Theophilus: The work they gave to someone else was the problem not ours
[22:00, 23.5.2018] GH GSE-p1a Aidoo Stephen Theophilus: But we fixed it all is well now
[22:00, 23.5.2018] GH GSE-p1a Aidoo Stephen Theophilus: Good evening sah
[22:19, 23.5.2018] GH GSE-p1a Aidoo Stephen Theophilus: And the wooden structure on it cause rain to get into it
[22:20, 23.5.2018] GH GSE-p1a Aidoo Stephen Theophilus: And also the borehole cover allows. Water to go through and around it to the bore hole

Montag, 10. Juli 2017

It-gh 170710

Time 8:30am
Place : Adum & Nkwantakese

# Today pump was purchased  and I met David ....so we come together with the solar panels.....straight to the site...

# Work progress for Sulley and Stephen's site  was inspected as well .....work still continues as the masons lay the foundation blocks...
P.P made a little adjustment that we added additional 1m to the 4m length proposed for the fetching station. ...

The mason continue with blockage for the pillars so they can level the foundation for concreting....

Samstag, 8. Juli 2017

It_gh 170704 Okubi water leaks

# time:11:00 am
# Venue : Okubi Hotel, Abrepo

After survey for the leak floors .....that is room 113 and 114...
Estimate was made for finding and fixing leaks....
Today room 114 leak was found and fixed...
Also air conditioning water leaks was identified on the terrace of first floor between room 100 and staff room. ...but Airconditioning repairers will have to check first before we proceed from there....
Room 113 is scheduled to fix together with AC leaks after repaired is done...

Samstag, 7. Januar 2017

It-GH 170107 okubi hotel new pump fixing.

Today I went to fix the new pump of 2hp at okubi . pump fixing time : 9:00am
Finished at 12:20pm...
Pump is working now and Okubi now start the cleaning of the pool now...

It-GH 170106 okubi pump purchase

Yesterday I made purchase for a new pump of 2hp to Okubi hotel to replace the old pump.
To be fixed tomorrow...

Donnerstag, 5. Januar 2017

it-Gh 161225 okubi estimate update

i  did an update of estimate for okubi hotel for pump replacement and pool filtering system.

https://drive.google.com/open?id=0BwUPsWGsMLpBNjlhUUt3WXRibnc